Having a background in Arts and Engineering,
Prototype for X/Y Axis
Why
- Increase the productivity of both the process and the operator
- Reduce alignment time
- Remove the need for the operator to do alignment
- Operator will be able to run more machines and focus more on in-process inspection
- Increase productivity by processing while the operator is doing the inspection
- Reduce human error due to alignment error hence reducing material wastage
- Reduce training time for new staff
- Current process is labor intensive
- Increase consistency of the product
- Streamline between shifts
Current Process
Proposed Process Testing
User
- All the operators who are assigned to work on the parts.
- They would have to work on multiple machines/parts as it have a long processing time is long.
- may not be tech savvy
- maybe lazy and do not want to do calculation for every piece.
- There will be some who make mistakes in calculation due to fatigue especially the night shift crew.
Scope, Constraints & Roles
Scope
- Upgrading an outdated machine at minimal cost
- Add automation
- Finding ways to integrate hobby grade components with an industrial machine
Constraints
- Worked on the project without upper management’s knowledge
- Working outside my job scope
- Hobby grade components has different voltage signal with the EDM machine
Roles
- Conceptualization
- Research
- Design
- Coding
- Fabrication
- Testing
Task Flow
Current Operator Task Flow
Human error due to using analog meter
CASE STUDY
Operators running the large wire will always operate multiple machines and when are assigned to more challenging tools, the machine will be left idle during process when the operator is attending to the other machine. For some tools, they would have to make 3 alignments during the whole process
- First alignment: at the beginning like another tools
- Second alignment: half way through the first impression
- Last alignment: at the second impression before the burning process continues
Proposed Task Flow
New operator task flow
The operator’s work has been cut down into 2 steps
Program task flow
Intergraded with EDM machine task flow
take all guesswork out of the equation
Process
Proposed control panel
Top View
Front View
Isometric View
Right Side View